This DN09 live service insertion checklist guides gas utility technicians through safe, compliant insertion of PE pipe into an existing service. It covers site tracing, barhole leakage surveys, excavations, electrical cross bonding, valve and gland assembly setup, pressure verification, rod and elbow testing, pipe cleaning, integrity and soundness tests, purging, sealing, and final reconnection to the property. It aligns with current SGN procedures and emphasizes safety checks, pressure monitoring, and waste disposal requirements.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.