Live Mains Insertion on Low-Pressure Mains up to 180mm
by Alan Milford, from the Community
This procedural checklist guides field operatives through live mains insertion on low-pressure gas mains up to 180mm. It details required tools and equipment, site preparation, bypass commissioning, flow stopping, purging, integrity pressure testing, insertion, and completion. It also covers service transfers, host main decommissioning, and live head recovery. Emphasis is placed on safety controls, gas isolation, pressure monitoring, leak detection, and proper reinstatement, with a final assessor sign-off.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
