Skip to content
SafetyCulture
Template

DN-15c: Dead Mains Insertion by Pushing

by Alan Milford, from the Community

Downloads: 0

This DN-15c checklist supports safe, controlled dead mains insertion by pushing for gas or water utilities. It covers site setup, required equipment, launch and receive pits, gauging and preparation of the parent main, PE pipe protection and guidance, and step-by-step insertion controls. It includes checks for marking lengths, bead inspection after butt fusion, intermediate excavation inspections, and direction changes with rollers. Final actions include capping ends, pressure testing to specification, and documenting pass or referral for further training.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.