This DN-15c checklist supports safe, controlled dead mains insertion by pushing for gas or water utilities. It covers site setup, required equipment, launch and receive pits, gauging and preparation of the parent main, PE pipe protection and guidance, and step-by-step insertion controls. It includes checks for marking lengths, bead inspection after butt fusion, intermediate excavation inspections, and direction changes with rollers. Final actions include capping ends, pressure testing to specification, and documenting pass or referral for further training.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
