This DN-17a procedure details how to carry out a safe single squeeze-off on PE gas mains for network isolation. It covers required documentation, tools and equipment, pipe identification and SDR checks, setting out squeeze points, establishing network pressure, assembling and pressure-testing a bypass and vent system, commissioning the bypass, and preparing and applying downstream and upstream squeeze-offs. Steps include cutting out and replacing the PE main using approved equipment and electrofusion, purging to achieve 90 percent gas-in-air readings, leak testing, and re-commissioning. Limits: LP up to and including 180mm mains and MP up to and including 63mm mains.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.