Skip to content
SafetyCulture
Template

Rose Court East ELV Fascia QA Checklist GL 8-12

by David Tucker, from the Community

Downloads: 0
Get this template

This construction QA checklist covers installation of the East elevation fascia at Rose Court, gridlines 8-12. It verifies Tyvek breather membrane lap and taping, absence and repair of rips, HH bracket positioning from gridlines and datums, correct fixings and quantities to substructure, sliding and load point locations, and alignment and leveling of vertical support L rails including movement joints. Includes fields for contractor details, project number, elevation and location, and comments to document inspection outcomes.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.