Use this quality assurance checklist to inspect and document mech-slip rainscreen rock panel installations. Verify Tyvek Firecurb membrane selection and taping, bracket spacing and fixings, vertical T and L rails to fixed and sliding points, movement joints at slab level, and Rocksilk insulation fitment with no gaps. Confirm panel type and color, rivet type and spacing, and overall alignment. Capture photos, add actions, assign owners and due dates, and collect installer, contractor, and client signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
