This Quality Assurance checklist supports the installation and inspection of Petrarch panel rainscreen facades. It guides teams through key steps including SFS QA verification, membrane checks and taping, support grid setup with top hats at correct centres, bracket spacing and fixings per drawings, vertical T/L connections at fixed and sliding points, and background works such as Rockwool insulation fitment with tight butted joints. The template enables photo and note capture, adding corrective actions with assignees, priority and due dates, and collecting installer, contractor and client signatures. Ideal for facade contractors and installers seeking consistent QA on aluminium rainscreen systems.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
