Skip to content
SafetyCulture
Template

A2O Porcelain Rainscreen QA Checklist

by William Carter, from the Community

Downloads: 0

Use this A2O porcelain rainscreen quality assurance checklist to verify facade installation. It covers structure handover, gridlines and datums, Tyvek membrane installation and repairs, bracket spacing and fixings, vertical T connections, Shackerley rail attachment, tile inspection for damage and tolerance, and correct tile restraint and head-fixing. Includes guidance on consistent 8mm (+/- 2mm) gaps, stainless steel fixings, photos and notes, corrective actions, and required digital signatures from installer, A2O, and client. Ideal for contractors managing rainscreen cladding QA and site documentation.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.