Skip to content
SafetyCulture
Template

Stone Rainscreen Quality Assurance Checklist

by William Carter, from the Community

Downloads: 0
Get this template

Use this stone rainscreen quality assurance checklist to verify each stage of facade installation. Confirm handover documents, gridlines and datums, and Tyvek membrane installation with repairs taped at a minimum 100 mm overlap. Check support grids, fixed and sliding point brackets, and vertical T sections are installed per drawings with stainless steel fixings. Inspect tile clips, stone tile tolerances, and consistent 6 mm spacing (+/- 2 mm). Record panel adhesive application, capture photos, assign corrective actions, and complete installer, contractor, and client sign-offs.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.