This ITP checklist covers the installation of prehung windows and doors. It verifies frame delivery condition, site handover with confirmed gridlines and datums, correct positioning from grid and datum, bracket and fixing installation and isolation, bead presence, and readiness for glazing. It requires perimeter insulation around frames and includes a hold point before EPDM works. The EPDM section checks perimeter attachment, correct application sequence, minimum 300 mm overlaps, and absence of rips or tears. The form captures first and second inspections and signoff from contractor and client representatives to ensure quality and compliance on site.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
