This MBS QA M 1.5 Plastic Ductwork Checklist supports quality assurance for HVAC installations. It covers compliance with specifications, delivery condition and protection, correct levels, secure supports with allowance for insulation and vapor seals, and fitting of turning vanes, splitters, dampers, flexible connections, and motorised dampers. It includes checks for correctly fitted and reset fire dampers with access doors, proper installation of controls and actuators, protection of open ends, correct labeling of valves, grille and diffuser installation, and final testing. Sections capture project details and require contractor and client sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
