Use this MEV plastic ductwork quality assurance checklist to confirm compliant installation of extract ventilation systems. Inspect that ductwork and fittings meet specification, installation matches drawings, connections to external brick vents are correct, and fire collars comply. Verify clipping within 500 mm both sides of walls, adequate supports, protection of open ends during install, and correct flexible connections. Capture site details, date, preparer, location, and the system inspected, then complete sign off with the checker name.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
