Rack Commissioning Quality Control Checklist

by David Ross, from the Community

Downloads: 100+
Get this template

This rack commissioning quality control checklist supports AV and IT integrators in validating builds before site handover. It covers initial checks such as receiving the BOM and stamped drawings, preparing the job envelope, and organizing manuals and accessories. Detailed verification includes power-up and grounding, cabling to Infocomm standards, ventilation and thermal spacing, and control system firmware, addressing, and code deployment. Audio DSP configuration and routing, telco interface tests, video switching and processing, and video codec setup are included. Final steps ensure IP configuration is recorded, drawings are redlined, punch lists cleared, temporary cabling removed, and the rack is returned in ready condition.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Rack Commissioning Quality Control Checklist Template | Free Template