Use this ITS as-built template to standardize documentation for network and field installations. Record ticket and NOI reference numbers, dates, preparer, and location. Add maps with box reference numbers, collect evidence with photos of boxes, equipment, and cable labels, note box type, and capture grid references using eastings and northings. Log whether equipment is present, list additional boxes and evidence, and finalize with signatures for handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
