Openreach A55 Checklist (GE Services Ltd V2)
by Steve Linacre, from the Community
This Openreach A55 template helps field engineers document network adjustment requests across ducts, poles, and chambers. Capture build area and DN, A55 type, PIANOI and DSR references, full site address, on-site contact, and completion details. Record overhead issues, equipment to be added, DP numbers, existing pole size and class, side loading, and private property considerations. Log chamber locations with X and Y coordinates, surface types, required chamber type, bores, distances to blockages, and photographic evidence. Note duct section numbers, congestion, additional capacity, possible cable recovery, and whether traffic management is required. Designed for accurate, on-site data capture to support Openreach approvals.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
