This Openreach A55 checklist helps telecom field teams scope and document network adjustments. It captures PIA NOI number, site address and contacts, completion date, and local authority. The form guides assessment of overhead issues, alternative routes, pole equipment and dimensions, DP number, pole size and class, existing and forecast wires, side load and private property considerations, and pole top consolidation. It includes chamber location and type, surface type, traffic management needs, bores, X and Y coordinates, photos, blockages and distances, duct sections, additional capacity, potential cable recovery, evidence of damage, OR portal screenshots, grid references, and signature.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
