Skip to content
SafetyCulture
Template

GE Services Blockage SPO Evidence Form

by Steve Linacre, from the Community

Downloads: 0
Get this template

Use this evidence form to document telecom blockage repairs for ducts or pole bends. Capture client and job references (PIA NOI, Siebel, GES), build area, PN and asset affected, location, and permit details. Record coordinates (eastings/northings), SLG setup, and whether the blockage involves a duct or pole bend. Attach required photos from pre-dig, excavation, repair, and reinstatement, showing split collars, secure ties every 10 cm, and connector bend. Log completion time and signatures for QA.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

GE Services Blockage SPO Evidence Form | Telecom Duct | Free Template