This Comecore Blockage Report template helps field teams record and verify duct and chamber blockages during telecom network works. Capture project area, location, and waypoint to waypoint details. Add photos of duct openings and blockage points, note the rod type used, and explain deviations such as not using 25 mm rods. Log blockage distances from each chamber or duct, support multiple blockage entries, and attach required evidence such as A55 images. Use this checklist to standardize documentation, accelerate fault finding, and improve the quality of network maintenance and reinstatement reports.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
