Use this checklist to document reinstatement works for blockage repairs. Capture site setup, permits, utilities marking, and hazard checks. Record excavation details with photos of initial dig, blockage, repair, sub base, sand and marker tape, and final surface (tarmac or verge). Enter measurements (length x width x depth) and coordinates (Eastings and Northings) to satisfy council requirements. Include bitumen use, reinstatement steps, site clearance, and completion time and date. Supports multiple blockages with repeatable sections.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
