Skip to content
SafetyCulture
Template

FTTH Failed Blow Report

by Andy Holland, from the Community

Downloads: 0
Get this template

Use this FTTH Failed Blow Report to capture key details after a failed fiber blow. Record site and job references, PN ID, postcode, blowing technician and date, confirm checks for air leaks and correct splice node, note attempts from multiple blowing points and directions, mark the suspected blockage on site and on civils drawings, log meterage from SN and from the Toby box, describe whether the stop was slow or hard, specify cable type and wasted cable, attach photos and notes, and obtain sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.