Use this generic field completion check to document site handover and compliance for telecom and contractor works. Capture title page details, network element, site, location, personnel, and dates; verify health and safety against UFF and contractor policy and OSH guidelines; attach a photo of the sign on sheet; confirm contractor JSA has been sighted; and add notes and images. Ideal for standardizing field audits that fall outside existing templates.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
