Skip to content
SafetyCulture
Template

Enable Connect Plan Version 5

by Matt Pretorius, from the Community

Downloads: 50+
Get this template

Structured form for planning fiber broadband connections for Enable Networks installations. Captures work order and job numbers, address and install date, planner and contact details, site access and consents, right of way and multi dwelling unit status, boundary drop and surface types, traffic management, inside boundary build requirements such as trenching, slot trench, thrusting, hard trench and cobblestone, ducts and draw wire, tube at external termination point, distances and connection to boundary. Covers internal installation types including back to back, ceiling, underfloor, external clipping, internal clipping and capping, with photo evidence and detailed installation notes. Includes outside and inside property consent items, end user terms, signatures and clear instruction to email the completed plan to scope.enable@clearvision.net.nz .

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.