DMR T3 As-built Checklist for Site Installations
by Irtiza Mumtaz, from the Community
Document site installation for DMR Tier III systems, including rectifier and battery setup, MCB panels, AC/DC checks, repeaters, RF components (antennas, combiners, filters), RF cabling and tuning, and radio rack mounting. Capture asset and serial numbers, label power and Ethernet cabling, follow IP diagrams, and attach required photos of racks, mains distribution, equipment rooms, towers, and site exteriors. Use quality checklists for routers and switches, confirm labeling and terminations, and record comments for each stage to deliver a complete as-built.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
