Use this structured cabling final check and Permit to Work checklist to close out network installations. Record comms cabinet details and photos, confirm mounting and power, log installed equipment and patch panels, test and document data points with CAT5 or Fluke results, capture as-built evidence, and obtain sign-off for safe, compliant handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.