DMR T3 As-Built Site Installation Checklist
by Irtiza Mumtaz, from the Community
Use this DMR Tier III as-built form to document end-to-end site installations. Record rectifier type, asset and serial numbers, battery and MCB panel details, AC mains checks, labeling and photos of power terminations. Capture RF works including repeaters, antennas, combiners, filters and cabling, plus filter tuning and radio quality checks. Log commissioning tests with GPS location, distance to tower, line-of-sight conditions and handheld signal levels. Include switch and router models, serials and quality checks, and attach required overview and site photos.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
