Use this move in inspection checklist to assess common property at Arena Lane Cove before and after a resident move. Sections cover pre move audit, post move audit, lift lobby condition, lift roof, walls and floor, corridor walls and ceiling, carpet, and unit door. Record notes, mark defects, attach photos, and capture inspector and resident signatures for a clear, auditable handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
