Skip to content
SafetyCulture
Template

Hegla Galactic Cutter PM Line 2 Shift 2

by Kim Blevins, from the Community

Downloads: 0
Get this template

Use this preventive maintenance checklist to keep the Hegla Galactic glass cutting system operating safely and efficiently during Line 2 Shift 2. Tasks include verifying safety barriers and signals, checking cutting oil levels, cleaning sensors and permanent magnets, blowing off table felts, draining moisture and confirming 6-8 bar air pressure, and changing the cutter wheel and axle. Designed for consistent, repeatable PM, this checklist supports equipment reliability, product quality, and worker safety.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.