Skip to content
SafetyCulture
Template

Hegla Galactic Cutter PM - Line 1 Shift 1

by Kim Blevins, from the Community

Downloads: 10+
Get this template

Standardize preventive maintenance for the Hegla Galactic glass cutter on Line 1 Shift 1. This checklist guides operators to check cutting oil levels, verify safety features, clean table felts and sensors, keep magnets free of contamination, drain the air dryer to 6-8 bar, change the cutter wheel, inspect the grinding head filter, clean guide rails and transport belts, confirm auto oiler levels, and inspect table stops to ensure safe, consistent performance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Hegla Galactic Cutter PM Checklist - Line 1 Shift 1 | Free Template