Use this final walk sign off checklist to support end of line quality verification in manufacturing. Inspectors can confirm completion status, check lights, record water test and electrical certificate results, log shortages, and hand QA shortage forms to purchasing. The form captures site, date, location, SO number, and whether the unit is a half or single. It also records comments, number of blue arrows, and signatures from the inspector and the customer to authorize completion and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
