NFPA 110 ATS Testing Checklist for Power Plants
by FAC Maintenance Team, from the Community
Ensure compliance with NFPA 110 Sec 8.4.6 using this ATS testing checklist for power plants. Conduct monthly transfer tests from normal to emergency and back, complete pre-test inspections, and verify control modules, breakers, fuses, and indicator lamps. Record TDNE and TDEN timings, note alarms during synchronization, and confirm restored power. Log hourly readings for ATS E1 and ATS 1 including voltages, current, frequency, load, kW, kVA, kVAR, and power factor. Capture observations, recommendations, photos, and technician signatures to maintain reliable emergency power systems.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.