Pre-Outage Distribution Board Inspection Checklist
by Tom Mannix, from the Community
This checklist guides electricians through pre- and post-outage inspections of distribution boards to ensure safe isolation and compliance with AS3000. It covers energized and de-energized testing, including 10-point voltage checks, phase rotation, insulation resistance, and polarity. Steps include lockout and tagout, earthing system verification including MEN and equipotential bonding, documentation of ratings and cable sizes, photos, and results. Post-outage tasks confirm updated labeling, re-testing, and switchboard load testing with current balance verification. Use it to standardize procedures and reduce risk during commissioning.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.