This PFC energization checklist guides electricians through safe commissioning of power factor correction equipment. It covers pre-energization inspections, verification against OEM drawings, isolation and lockout, compartment and connection checks, CT and controller validation, and capacitor details. Testing steps include earthing resistance, insulation resistance, and polarity. Post-energization procedures include a 6 point voltage test, phase rotation checks, controller configuration, CT and voltage verification, cooling fan function, and manual capacitor step testing. The template concludes with equipment records and onsite and engineering sign offs to confirm compliance with design specifications.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.