Use this panelboard inspection report to document equipment ratings, feeder details, conductor and grounding sizes, and panel enclosure type. Capture torque checks, labeling, schedule verification, and safety items, then record insulation resistance megohms, voltage measurements, and phase rotation. Include commissioning steps such as factory settings, third party testing, energization, and acceptance, plus general comments. Ideal for electrical installation pre energization and QA.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.