Terra Centrifuge Commissioning Checklist 2.1
by Drew Bollich, from the Community
This commissioning checklist helps supervisors verify the safe setup and operation of a Terra centrifuge system before start‑up on rig sites. It covers paperwork and readiness (JSA, risk assessment, DOR, AFE), installation checks, hazard mitigation, electrical grounding, and equipment placement. Detailed sections guide inspections of the drying shaker, feed and discharge augers, pumps, dryer, centrifuge stand safety devices, and centrifuge wear items and settings. It also includes inventory checks for screens and chemicals, toolbox readiness, and liability mitigation steps, with prompts for photos and notes to document findings.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
