Skip to content
SafetyCulture
Template

Stallion Centrifuge Commissioning Report

by Robert Domingue, from the Community

Downloads: 20+

Use this supervisor-led commissioning report to document Stallion centrifuge setup on drilling rigs. Capture paperwork checks such as JSA and risk assessments; verify safe hose routing, cable management, and grounding; inspect BICC connectors, drying shakers and screens, centrifuge stands, and wear liners. Record feed pump wiring and rotation, overall rig-up photos, and third-party equipment for liability mitigation.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.