This installation audit checklist helps field teams verify the safe and correct setup of acoustic loggers on water network assets. Assess site risks and chamber access needs, confirm traffic control and manual handling considerations, and check for sharps exposure. Validate surface antenna mounting on lids, ensure the logger is fixed to a fire plug or valve with secure ground contact, and confirm Bluetooth login, Run mode, and internal settings such as firmware, clock, and battery. Capture photos to document installation quality.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
