This sewer lateral inspection checklist helps verify key elements of a private sewer connection before approval or maintenance. Inspectors can confirm cleanout accessibility, identify connection points and tap locations, and document whether a drop-in is installed at the manhole. It also covers property line cleanouts, pipe type approvals, multiple structures served, and the presence of a working backflow prevention device. The checklist flags illegal connections such as sump pumps, roof gutters, foundation drains, and heat pumps, and prompts inclusion of a site drawing showing buildings, roads, water lines, and the proposed lateral path. Use the corrective actions and comments sections to capture issues and resolutions, and record inspector details and timestamps.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
