Skip to content
SafetyCulture
Template

Electric Vehicle Charge Point Pre-Installation Survey

by Michelle Ergider, from the Community

Downloads: 10+
Get this template

This Electric Vehicle Charge Point pre-installation survey template helps assess site readiness before installing EV chargers. Capture site details, hazards, and access, verify existing supply, MPAN, maximum demand, agreed capacity, and spare capacity, and document DNO or ICP requirements. Record origin and metering details, earthing arrangements, proposed loads, and upload photos. Specify charger types, quantities, cable types and sizes, routes, and switch gear locations. Include civil works scope, bay sizes and marking, signage, and client sign off. The Annex D checklist covers hazardous zones, metering suitability, supply adequacy, earthing compliance with BS 7671, PME precautions, mobile coverage for connected equipment, manufacturer instructions, planning permission, and client approvals.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.