EV Commissioning Checklist and Electrical Tests
by Kathryn Smith, from the Community
Use this EV commissioning checklist to verify electric vehicle charger installations meet BS 7671 requirements. Assess charger location, impact protection, control heights, ventilation, and trip hazards. Confirm labeling of EV outlets and precautions against inadvertent energizing. Record supply capacity, phases, metering, cut-out rating, and earthing type. Complete dead and live tests, capture installation photos, demonstrate operation to the customer, and sign off with commissioning date.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
