Use this EV installation electrical report to document site access and egress, charging bay markings and signage, charger models and counts, cable entries, supply ratings, earthing arrangements, RCD and surge protection, PEN fault requirements, touch potential, commissioning status, contactless payment terminals, and overall compliance with BS 7671 and PAS 1899. Capture photos of AC and DC sockets, record panel board capacity, and note observations. Completed by the electrical team and signed by the electrical supervisor.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
