Reinstatement of External Meter Patch Checklist
by Dave Taylor, from the Community
This practical checklist supports utility and field crews in reinstating external meter patches to standard. Record work order details, site address, land classification, and type of work. Select surface types such as DBM, HRA, concrete, slabs, verge, turf, or block paving. Capture condition, meter face, and final site photos, note the meter box location and distance from fixed structures, and verify surface reinstatement. Log completion status, reasons if not completed, and obtain crew name and signature.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
