Skip to content
SafetyCulture
Template

Post-Install LightReach Photo Checklist

by Kateryn Ayala, from the Community

Downloads: 0
Get this template

This LightReach post-install photo checklist guides solar installers through the required photographic documentation for quality assurance, compliance, and incentives. It covers site and array photos, inverter and IQ Combiner serials, module labels and serials, roof mounting details, wire management, junction boxes, tilt measurements, AHJ permits, and plan sets. Electrical requirements include main breaker and busbar ratings, point of interconnection, BOS pullbacks, meters and CTs, fused disconnects, and sub panels. Storage steps outline battery labels, communications cabling and drain wire, battery CT placement, BOS context photos, and gateway or system controller details. Commissioning notes for Tesla systems and incentive-specific photos are also included.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.