PQC Audit Checklist for Solar Installations

by Drake Queener, from the Community

0
Get this template

Use this PQC audit to document and verify solar PV and battery installations from pre-install to post-commissioning. Capture site identifiers and pre-install photos, assess racking and wire management, DC conduit runs, and equipment labeling. Confirm inverter and battery serial numbers, battery module checks, CT calibration, interconnection at the MSP, islanding mode, and system commissioning screens. Include AC disconnects, protected load panels, breaker labels, and safety signage. Record insulation measures, EEP box status, and Generac registration to ensure a complete, compliant handover.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.