Use this PQC audit to document and verify solar PV and battery installations from pre-install to post-commissioning. Capture site identifiers and pre-install photos, assess racking and wire management, DC conduit runs, and equipment labeling. Confirm inverter and battery serial numbers, battery module checks, CT calibration, interconnection at the MSP, islanding mode, and system commissioning screens. Include AC disconnects, protected load panels, breaker labels, and safety signage. Record insulation measures, EEP box status, and Generac registration to ensure a complete, compliant handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.