This renewal survey template audits mechanical, electrical and refrigeration services in a retail store to inform a carbon neutral upgrade plan. Capture store details, salesfloor temperature and lux plots, door dimensions and heaters, and assess deli, bakery, cafe and staff areas. Inspect boiler and electrical plant rooms, generators and emergency systems. Review warehouse doors, coldrooms and lighting, plus roof plant including AHUs, condensers and extract fans. Finally, propose energy-saving technologies such as solar, LED upgrades, switching and controls, aerofoils on fridge cases, destratification and pump optimization.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
