Use this audit to assess civil cable installation works for electrical distribution projects. Verify site specific risk assessment and team credentials, DNO identification, vehicle and winch setup, spill kit availability, pulling tensions and winch calibration. Check stocking and swivel attachment, trench depth and sanding, debris removal, roller use and spacing, and correct bell mouth installation. Capture photos, confirm communication between winch operator and crew, and review general housekeeping before signing off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
