This final audit form for water reticulation helps verify that newly constructed water assets comply with approved design drawings and industry standards prior to handover. Use it to check trenches and reinstatement, confirm no subsidence, and verify installation of valves, fire plugs, indicators and markers. Assess that surface fittings are level, areas are clean, and jointing, bedding, backfill and compaction meet contract requirements. Confirm washout assemblies and as-constructed plans, flush mains and record chlorine residuals if applicable, ensure all valves operate, and note readiness for connections or tappings. Add notes, photos and signatures to complete the audit record.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
