Use this construction audit form to assess water reticulation works for compliance and safety. Check OHS measures such as road traffic control, barricades, trenching, and protective clothing. Verify pipe and fitting materials, coating standards, storage and handling. Review pipe laying practices for jointing, bedding, backfill, trench support, compaction, thrust blocks, depth of cover, and conformance with design drawings. Capture notes, photos, and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
