Skip to content
SafetyCulture
Template

WUC Firezone Installation Checklist

by Ganesan Gopal, from the Community

Downloads: 0
Get this template

Conduct thorough Firezone wall system checks before sign off. This checklist covers NCC framing requirements AS1664 and AS4600, removal of shiplaps at slab and roof terminations, four hour fire rated sealant, horizontal and vertical panel layout, 20 to 40 mm clearances, bracket spacing to 450 mm, intermediate brackets, screw spacing to 300 mm, and verification of panel integrity and approved penetrations. Capture comments, photos, and supervisor sign off to document compliance on site.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

WUC Firezone Checklist for Fire Rated Wall Installation | Free Template