Skip to content
SafetyCulture
Template

WUC Firezone Installation Checklist

by Ganesan Gopal, from the Community

Downloads: 0

Conduct thorough Firezone wall system checks before sign off. This checklist covers NCC framing requirements AS1664 and AS4600, removal of shiplaps at slab and roof terminations, four hour fire rated sealant, horizontal and vertical panel layout, 20 to 40 mm clearances, bracket spacing to 450 mm, intermediate brackets, screw spacing to 300 mm, and verification of panel integrity and approved penetrations. Capture comments, photos, and supervisor sign off to document compliance on site.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

WUC Firezone Checklist for Fire Rated Wall Installation | Free Template