Installation of Steel Framing System Checklist
by Sebastian Szabo, from the Community
This installation checklist helps contractors and site teams verify key steps in steel framing works. It covers design compliance, deflection heads (25 mm) per engineering details, correct stud gauge/size and maximum 600 mm spacing, window openings per architectural drawings, and the installation of Siniat weather defense boards. It also checks use of GTEC fire-rated silicone sealant at board joints and at interfaces with concrete, plus correct fixings and spacing (max 300 mm, 13–20 mm from board edges). Use it to document locations, responsible parties, and sign-off to drive quality and compliance.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.