Use this Windows and door installation handover template to verify workmanship across each opening and room. Inspect operation, locks and restrictors, fixings to masonry, sealant use, draught proofing, trickle vents, trims and finishes, drainage, numbers and letter box fittings. Includes sections for address and MP number, kitchen, hall, lounge, landing, bedrooms, bathroom, front and rear doors, plus site manager and customer sign off. Attach notes or photos and document any defects for rectification and final acceptance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
